logo
next
prev

Wrocław

TAT 6 and 16 to Nowy Dwór

Installation of a vibration-insulating RCS system on the tramway trackbed with a concrete track ballast and an abrasive overlay.
6000 mst and 3 tramway switches of the Wrocław Bus and Tram Route to Nowy Dwór were equipped with RCS.

Year of assembly

2019/2020

Purchaser

Wrocław Investments

Quantity

6000 mst + 3 tramway switches

Systems used

RCS system + 3 tramway switches

Zobacz więcej realizacji

Contact us

    The website is protected by reCAPTCHA and is subject to the following Google terms: privacy policy, Terms of Service