next
prev

Poznań

Chartowo, tunnel entrance

The installation of a vibration-insulating RCS system on the tramway track bed with track ballast made of crushed stone at the tramway tunnel entrance on Chartowo Street in Poznań.
200 mst were equipped with the RCS system.

Year of assembly

2018

Purchaser

ZTM Poznań

Quantity

200 st

Systems used

RCS system (Railway Control Solutions)

See more projects

Contact us

    The website is protected by reCAPTCHA and is subject to the following Google terms: privacy policy, Terms of Service