The beginning of 2023 is a particularly intense time for MMR Group TransComfort.In January and March it will deliver almost 3,000 mtp of the RCS® anti-current and anti-vibration insulation system and vibroinsulating track bed mats for the redevelopment of tracks in Warsaw, Szczecin and Olsztyn.
The RCS® anti-current and anti-vibration insulation system is designed for all common locations and track constructions on tram track networks. The main elements of the structure are elastomeric profiles which fasten and insulate the rail and anchor nodes of a simple structure. Rail profiles do not collide with any commonly known and used rail fastening.
MMR Group TransComfort has been implementing the RCS® system in Poland since 2000 in the largest cities in Poland, including Szczecin, Warsaw, Poznań, Wrocław, Gdańsk, Kraków, Silesia and Zagłębie. Further projects are planned for the beginning of 2023:
- Szczecin, Wojska Polskiego St. – RCS® system for rail 60R2, concrete track – 511 single track meters (contractor: STANLED Sp. z o.o.), investment details:
- Szczecin, Kolumba St. – RCS® system and vibroinsulating track bed mats to 1 crossover (contractor: Grupa ZUE), investment details:
- Warsaw, Gagarina St. – RCS® system for 49E1 rail with W-Tram mounting, green track – 1436 single track meters (contractor: Balzola Polska Sp. z o.o.), investment details:
- Olsztyn – RCS® system for rail 60R2, concrete track – 891 single track meters (contractor: Trakcja S.A.), investment details:
Detailed information on e.g. construction of the RCS® system, vibroinsulating track bed mats and other solutions for track infrastructure are available at www.tc.mmrgroup.pl.